HCE HAS PROVIDED DECOMMISSIONING CONSULTANCY SERVICES TO ROYAL DUTCH SHELL PLC SINCE 2008.
We have been involved throughout the decommissioning process for the Brent Field that has incorporated a wide spectrum of services ranging from feasibility and feed technical studies, strategic and OSPAR compliance advice to providing input to revised safety cases. HCE staff were appointed as the designated structural technical authority for the Brent Field decommissioning during feed.
Web Design by Pedwar